Condition Grade A–D gives buyers instant clarity and gives sellers a roadmap. Instead of vague claims like “well maintained,” this transparent model scores the big six: hull, main engine, auxiliaries, electrical, safety, and documentation—each with weights, audit notes, and a practical checklist to lift the grade before listing.
Condition Grade (A–D) — A Transparent, Weighted Model for Ship Listings
Replace vague adjectives with a clear, auditable score. Sellers uplift value with a targeted prep checklist; buyers compare vessels on facts, not feelings.
1️⃣ How the Grade Works
The overall score is a weighted average of six subscores (0–100). Letter grades: A = 90–100, B = 80–89, C = 65–79, D = <65.
2️⃣ Live Scoring Tool
Adjust each subscore (0–100). The tool applies weights, shows the letter grade, and suggests targeted improvements.
3️⃣ Seller Prep Checklist to Boost the Grade
Run this list 4–8 weeks pre-listing. The goal is to close gaps that drag the weighted score.
- Schedule UT thickness where coatings are thin.
- Touch-up coatings at known abrasion zones.
- Document last dry-dock scope with photos.
- Close overdue overhauls and log OEM parts.
- Run oil analysis; attach lab PDFs.
- Capture trend screens (SFOC, EGT) with notes.
- Test-run generators under load; log vib/temps.
- Replace known-failure consumables; list spares.
- Close small leaks; document gasket/valve work.
- Megger test critical feeders; note IR values.
- Thermal scan switchboards; fix hot spots.
- Update single-line drawings; version stamp.
- Service LSA/FFA; attach certificates and expiry dates.
- Log two recent drills with outcomes and photos.
- Close open NCRs; add corrective action evidence.
- Verify class/statutory validity; list renewal dates.
- Compile ownership chain and service history index.
- Export PMS history (last 24 months) to PDF.
4️⃣ How Buyers Should Read the Grade
- A in Hull or ME often justifies a premium if documentation backs it.
- B overall with strong docs can outrank a higher raw score with gaps.
- C in Electrical or Safety signals short, schedulable downtime; price accordingly.
- D in Documentation introduces counterparty and delay risk; escrow conditions recommended.
5️⃣ FAQ and Notes
- Independent surveyors can certify subscores; attach survey ID and date.
- Weights are adjustable by segment (e.g., offshore may up-weight electrical/safety).
- Always include evidence: photos, lab PDFs, class screen captures.

